Installation of the stationary radiation control equipment, electricity connection and telecommunication connection development works in Riga Port, the Zilupe border control point and Liepaja Port.
Customer: Tetra Tech EC, Inc.
Designers: Skonto Būve Ltd.
Project implementation period: 05.2011. - 01.2013.
Adress: Kaķasēkļa dambis 28A, Riga; Railway stage Station Brasa – Station Riga Krasta, km 2+427.5, Riga; Uriekstes iela 9, 16, Riga; Railway stage Zilupe Railway RKP – State Border, Stacijas iela 2, Zilupe; Sliežu iela 9, Brīvostas iela, Kaiju iela 11/13, Liepaja

Within the scope of the international agreement “Regarding Cooperation in the Prevention of the Illicit Trafficking of Nuclear and Other Radioactive Materials” the US company SES TECH Global Solutions entered into a contract with SIA Skonto Būve regarding designing and radiation control equipment installation works in Riga Port, the Zilupe border control point and Liepaja Port.Within the scope of the project the basic radiation measurement equipment production and assembling works and electricity and telecommunication connection establishment works were carried out, including designing.