The building was reconstructed within 10 months, a very short term of time. To achieve that, 26 subcontractors who had demonstrated their quality of work and professional expertise in previous instances of collaboration, were involved in the works. A careful choice of subcontractors and highly efficient work management made it possible to complete the reconstruction in accordance with the specified quality requirements within the scheduled term of time.
A lot of glass was used in the construction and a panoramic lift and view spots were installed along the rise of the outer wall to complement the harmony of the existing historical buildings, providing guests staying at the hotel and visitors of its bars and restaurants with a picture postcard view which opens from top storeys of the building. A spacious glass room was built on the roof top housing a modern body-building hall. Next to it there is a huge steel decoration which complements the new design of the building.