The project involved the reconstruction and resurfacing of Dārzciema Street and Krustpils Street.
- The following construction works were carried out during the reconstruction of Dārzciema Street between the right bank approaches of the South Bridge and the intersection of Dārzciema Street and Rēzeknes Street: construction of a carriageway of 7810.19m2 for motor traffic, construction of sidewalks of 2239.05m2 for pedestrian traffic and a lawn area of 1882.07m2 – the total lengths of the constructed street (overpasses) was 426m; installation of traffic signs and traffic lights; construction of public transport stops, pedestrian barriers, as well as all external engineering networks: rain water drainage, exterior lighting, electrical networks, rainwater receivers; resurfacing.
- The following construction works were carried out during the reconstruction of Dārzciema Street between the right bank approaches of the South Bridge and the intersection of Dārzciema Street and Rēzeknes Street: construction of a carriageway of 24 607.34m2 for motor traffic, construction of sidewalks of 7557.21m2 for pedestrian traffic and a lawn area of 39 305.68m2 – the total length of the constructed street (overpasses) is 1167m; installation of traffic signs and traffic lights, pedestrian and vehicle barriers; construction of public transport stops, as well as all external engineering networks: rain water drainage, exterior lighting, electrical networks, rainwater receivers, heating mains.