At the end of 2010 the second stage of Cesis New Castle reconstruction, implemented by “Skonto Būve” Ltd, was completed. It included the reconstruction and renovation works on the third and fourth floors of the Castle, as well as the staircase of the Castle. Facilitation of the Castle’s exterior has been implemented as well.
During rebuilding works a facilitated conference hall for 50 people was constructed on the third floor of the Castle. It is equipped with all the necessary sound and translation systems. The loft has been rebuilt to create an exhibition hall-gallery there, which can be used for both – exhibitions, as well as organising museum-teaching programmes and other educational events.
The authenticity of the finishing and layout has been retained within all the tasks, natural linseed oil and casein glue based paints have been used. Fittings authentic to the century have been worked into the finishing, production has been used.
While retaining the authentic pattern of the Castle, engineering networks have been added, as well as cooling and ventilation systems installed, which provide climate conditions that correspond to modern requirements.